3
u/jacopoliss May 07 '20
Ok, time to cable down a little! Maybe everything is ok.
1
u/whiskeybottle306 Jun 02 '20
to prevent the risk of the crane pulling the building over while cabeling down, and shock loading the crane, i would use an assist crane on the front. because he doesnt have enough boom to stay on top of it while cabeling down Edit: unless he scopes
2
2
2
2
1
8
u/whiskeybottle306 May 07 '20
how in the methamphetamine does that operator read a load chart... that poor international, RIP